PREPARATION OF THE SUBSTRATE AND APPLICATION CYCLE
Iron. It is essential to sandblast to SA 2.5 grade before applying EPOZINC 2C. The product must necessarily be applied within 6 hours of sandblasting the substrate. Apply EPOZINC 2C according to the recommended dilutions and then over paint with the defined painting cycle.
There are no reviews yet.